Case Study Number: 8
OFFICE
An ESG-focused retrofit cut energy and carbon by over 90% through upgrades to envelope, HVAC, lighting, and renewables.
Location: Dublin 24 (Urban)
Size: N/A Constructed in: c. 1990
BER Before: C3 | BER After: A3
Energy Savings: 1,800 kw/m /yr – 91% reduction in energy cost 2
Carbon Savings: 92% operational CO₂
Display Energy Certificate: N/A