Case Study Number: 6
OFFICE
A deep retrofit improved efficiency and appealthrough fabric, glazing, and M&E upgrades.
Location: Dublin 2 (Urban)
Size: 397 m²
Constructed in: 1990
BER Before: F | BER After: B2
Energy Savings: Significant (based on BER)
Carbon Savings: 791 tonnes (embodiedcarbon from demolition avoided)
Display Energy Certificate: N/A