Case Study Number: 22
HOSPITALITY
A medium retrofit added advanced HVAC and controls to cut energy use and boost comfort in a live city-centre hotel.
Location: Temple Bar, Dublin 2 (Urban)
Size: Not specified (142 Bedrooms + Restaurant, Bar, Sports Club) Constructed in: Not specified
BER Before: N/A | BER After: N/A
Energy Savings: 1.6 GWh annually
Carbon Savings: 231 tonnes CO₂ annually
Display Energy Certificate: N/A