Case Study Number: 16
HOSPITALITY
A deep renovation modernised this rural leisure centre through a full services overhaul and renewable energy integration—cutting carbon by 65% and slashing energy costs by over half.
Location: Clare (Rural)
Size: N/A
Constructed in: 1950 (with 1996 addition)
BER Before: E | BER After: A2
Energy Savings: 56% in energy costs
Carbon Savings: 65% operational CO₂
Display Energy Certificate: N/A